Research Support

"Optimization of Augers for Subterranean Warfare" from the U.S. Air Force Research Lab-Munitions Directorate (with Jason Baird, UMR Explosive Research Center), for term Sept 23, 2003 to Sept 24, 2004. Contract amount: $50,000 (Rogers portion 30%)
"Creation of a Prototype Web-Based Geotechnical Database for the St. Louis Metro Area, Missouri and Illinois": U.S. Geological Survey National Earthquake Hazard Reduction Program, May 2004. Contract amount $128,579 (Rogers share $109,292), Term 1 Dec 2004 to 30 Nov 2005.
"Age Determination of Composite Landslides in the Grand Canyon Region Using Palynology" (with Francisca Oboh-Ikuenobe), Geology and Paleontology, Division of Earth Sciences, National Science Foundation, July 2004. Contract amount: $104,171. Term 1 Dec 2004 to 30 Nov 2005.
"Determination of Shear Wave Velocity Along a Segment of Interstate 70, St. Louis, MO" from the Missouri Department of Transportation (Co-PI with Neil Anderson in UMR- Geophysics), term Dec 9, 2003 to Dec 8, 2004. Contract amount $8,800 (Rogers portion 20%)
"Mapping of Seismically-Induced Landslippage in the Western New Madrid Seismic Zone": University of Missouri Research Board, awarded January 1, 2003. Contract amount: $20,157 (Rogers Portion 100%)
"Mapping of Seismically-Induced Landslippage in the Benton Hills and Crowley抯 Ridge, New Madrid Seismic Zone, Missouri and Arkansas", U.S. Geological Survey National Earthquake Hazards Reduction Program, awarded November 1, 2002. Contract amount: $36,867 (Rogers portion 100%)
"GPR Investigation of Concrete Integrity, Shepard of the Hills Hatchery, Branson, Missouri", (Co-PI with Neil Anderson and Richard Stephenson): Missouri Department of Conservation, awarded September 15, 2002. Contract amount: $12,500 (Rogers portion 20%)
"Earthquake Hazard Mitigation Research Program For Highway Systems" (with Neil Anderson, Genda Chen, Richard Stephenson, Ronaldo Luna, Pedro Silva, David Enke and Gary Spring): Federal Highway Administration and Missouri Department of Transportation, $800,000, awarded for two year term January 30, 2002 to January 31, 2004. Contract amount: $800,000 (Rogers portion 10%)
"Slip Rate and Earthquake Recurrence on the Concord fault at Galindo Creek, California" (with D.L. Snyder, G. Borchardt and C.J. Wills), Final Technical Report to U.S. Geological Survey under contract 1434-94-G-2483, Sept, 1995, Contract amount: $39,537 (Rogers/Pacific portion 50%)
"Development of a Computerized Well Database for Alameda and Contra Costa Counties, California", U.S. Geological Survey, National Earthquake Hazard Reduction Program RFP 1923, awarded December 10, 1992, Research Contract 1434-50023: January 1992-March 1994. Contract amount $93,997 (Rogers portion 100%)
"Engineering Geologic Site Characterization of the Greater Oakland-Alameda Area, Alameda and San Francisco Counties, California", National Science Foundation Grant No. BCS-9003785: Final Report to the National Science Foundation, October 1990-Dec 1991. Contract Amount $44,900 (Rogers portion 100%)
"Evaluation of Geotechnical Conditions Leading to the Partial Collapse of the I-880 Cypress Structure and East Span of the San Francisco-Oakland Bay Bridge": for California Department of Transportation, Legal Department, San Francisco (1989-92). Contract amount $95,000 (Rogers portion 100%)